ENGINEERING BUILDING ADDITION - CM/GC Services

  • Project No. 21-013
  • Request for Proposals for Construction Management/General Contracting Services for the Engineering Building Addition project

Project Design Documents

Addendum #1 - Revised Schedule Dates -  Posted 28 June 2021

Addendum #2 - Updated Schedule and Shortlisted Firms - Posted 19 July 2021

Addendum #3 - Cost Proposal Form, Appendix D: Exhibit A in excel format for short listed firms.

Mandatory Pre-Submittal Conference:  Monday, June 7, 2021, 10 AM

  • Conference location:  UCCS Dwire Hall, Auditorium Room 121, 1420 Austin Bluffs Pkwy, Colorado Springs, CO  80918
  • List of Firms Attending Pre-Bid Mtg on 6-7-21 - Posted 6-7-21
  • Written Questions Due:  Wednesday, June 9, 2021 at 12 PM
  • email questions to Kent Marsh,  at propsubm@uccs.edu
  • Answers will be posted here on Friday, June 11, 2021 by 5 PM
  • Response to Questions - Posted 6-10-21

RFP Submittals Due (Prequalification: Step 1):  Friday, June 18. 2021 by 2 PM

  • ELECTRONIC SUBMITTAL will be received until 2 PM on June 18, 2021, for the furnishing of labor, materials, and equipment for the project described as: Engineering Building Addition
  • Electronic Submittals shall be submitted by email to: University of Colorado Colorado Springs, Kent Marsh, propsubm@uccs.edu
  • Submittals shall be limited to 30 single sided pages (exclusive of required forms)
  • Late submittals will be rejected without consideration.  The University of Colorado Colorado Springs and the State of Colorado assume no responsibility for costs related to the preparation of submittals.

Sealed Proposals  Due (Evaluation and Award: Step II):  @ INTERVIEW

  • Submittals shall be limited to 30 single sided pages (exclusive of required forms)
  • Late submittals will be rejected without consideration.  The University of Colorado Colorado Springs and the State of Colorado assume no responsibility for costs related to the preparation of submittals.

CMGC Interview List released Thursday, July 15, 2021 

  • CMGC Oral Interviews (as scheduled) 2 August, 2021 at Campus Services Bldg Conference Room 204

 

Anticipated Project Construction Start/Finish:  January 10, 2022 - June 1, 2023

 

Last Reviewed:  27 July 2021 - DL

[ ENGINEERING BUILDING ADDITION - RFP ]