Cybersecurity and Space Ecosystem Expansion
Cybersecurity and Space Ecosystem Expansion
Thursday, May 27, 2021
Cybersecurity and Space Ecosystem Expansion
Project No. 20-016
- Construction Documents: Project Manual
- Construction Documents: Drawings
- Addendum 01 - Posted 18 June 2021
- Hazardous Materials
- Roof System Description
- TRW Addition 3 North Side Original Building
- TRW Core & Shell Remodel
- TRW Expo As-Builts North Side Remodel
- TRW Original Building South Side Partial Structural
- Substitution Request
- Drawings
- Project Manual
- Advertisement for Bid (OSA-AFB-1)
- SBP 6.12 Information for Bidders
- SBP 6.13 Bid Form
- SBP 6.131 Bid Alternate Form
- SBP 6.14 Bid Bond Form
- SC 6.21 Contractors Agreement DBB
- SC 6.23 General Terms and Conditions
- SC 6.22 Performance Bond
- SC 6.221 Labor and Material Bond
- UI-1 Certification and Affidavit Regarding Unauthorized Immigrants
- Addendum 02 - Posted 22 June 2021
- Addendum 03 - Posted 15 July 2021
Mandatory Pre-Submittal Conference and Tour: June 10, 2021 @ 10 AM
- Meeting Location: Project Site, Cybersecurity Building, 3650 North Nevada Ave., Colorado Springs, CO 80907
- Mandatory Walk Sign-In Sheet - Posted 6-11-21
- Walk Opportunities for Sub-Contractors:
- Monday, 6-14-21 1 - 2 PM
- Wednesday, 6-16-21 1 - 2 PM
- Friday, 6-18-21 1 - 2 PM
Questions Due: June 14, 2021 @ 5 PM
- email questions to Charles Cummings at submit@uccs.edu
- Answers will be posted here by 5 PM on June 18, 2021
Sealed Bids Due: June 24, 2021 by 1 PM
- One (1) hard copy will be accepted by hand delivery in a sealed envelope to the following address:
- UCCS Campus Services Building, 2nd Floor Reception Desk
- 1420 Austin Bluffs Parkway
- Colorado Springs, CO 80918
- Late bids will be rejected without consideration. The University of Colorado, Colorado Springs and the State of Colorado assume no responsibility for costs related to the preparation of Bids.
Bid Opening: The bid opening will be held remotely via a Teams meeting for those wishing
to witness the opening. The link to the bid opening meeting will be posted to the UCCS
website.
Anticipated Begin Work Date: July 9, 2021 Anticipated Project Completion Date: January 31, 2022
NOTICE OF CONTRACTORS SETTLEMENT - posted 2 May 2023
Last Reviewed: 02 May 2023 DL